
PHASES OF VIADUCT PERFORMANCE WITH MOVABLE CANTILEVER SCAFFOLDING
Апстракт
The construction of Motorway Kicevo – Ohrid is planned to reduce the time for traveling and
obtain the safety of all participants in traffic.
The largest construction company in North Macedonia, Granit Construction Stock, is in
charge for the construction of the first 10,42 km of the Motorway i.e. Section 1 which is from
Kicevo to village Podvis.
The geographical location of this part of the route indicates the need for engaging large number
of machines, workers and team of engineers and technicians.
The execution of Viaduct at km 9+105, which has the largest span between middle piers ever
performed in these areas of 164.5m, is of particular importance.
The length of the viaduct is 385,51 m on the left carriageway and the right carriageway is
slightly shorter.
Making such a viaduct is especially interesting because we as Macedonian engineers had the
opportunity for the first time to participate in the construction of such a specific object.
Considering the fact that in our country there is no concrete literature that deals with the
technology of viaduct construction using a balanced cantilever carriage system, it can be
concluded that the results of this research have a significant practical contribution to the civil
engineering in our country.
The stages of construction for such a specific viaduct have been elaborated, as well as the
application of modern tailor-made systems for the construction of such a specific facility.
The use of such systems significantly shortens the construction time of the facilities and
improves the quality of the work performed.
In the everyday race with the time for profit and quality of the work done, the use of such
systems is necessary not only because of the shortened execution time but also because of
the minimal need for labor.
In today's world where the number of workers is decreasing sharply, it is important to start
using modern, easy-to-use molding systems that do not require large numbers of workers to
engage with them. Also, the training and application of modern coating systems will
significantly make us more competitive in the foreign market
Автори
1. Mr. Sc. Ivana Dimitrova
1. Mr. Sc. Ivana Dimitrova
Клучни зборови
modern formwork, pouring step, BCC, side hangers, hanging scafold
modern formwork, pouring step, BCC, side hangers, hanging scafold